Renewable energy in County Sligo
What solar, batteries and heat pumps mean for homes, farms and businesses in Sligo: how much sunlight the county gets, which SEAI grants apply, and what to check before you start.
Source: PVGIS, European Commission JRC, 1 kWp, 35 degree tilt, due south, 14% losses. Fetched 2026-11-13.
How much power a roof in Sligo can make
At Sligo, a south facing system at a 35 degree tilt produces about 845 kWh a year for every kWp of panels (PVGIS, European Commission JRC). That ranks Sligo 31st of 32 counties, below the median county.
The figure is for a well placed system. East or west facing roofs, flatter pitches and shading from trees or nearby buildings all reduce it, which is why a site survey matters more than any county average.
What you save depends on how much of that output you use yourself, and that is on your electricity bill. Day and night units, or half-hourly data from a smart meter, show it plainly.
| Rank | County | kWh / kWp |
|---|---|---|
| 29 | FermanaghNI | 850 |
| 30 | Donegal | 845 |
| 31 | Sligo | 845 |
| 32 | Derry/LondonderryNI | 834 |
Guides for Sligo
Each guide explains how the technology works, who it suits and what rules apply.
Solar for homes
Panels on the roof turn daylight into electricity the house uses first. What is left over can be exported to the grid.
Read the guideHome batteries
A battery stores daytime solar for the evening, so more of what the panels make is used in the house.
Read the guideHeat pumps
A heat pump moves heat from the outside air or ground into the house and runs on electricity, which pairs well with solar.
Read the guideSolar for farms
Farms use a lot of power in daylight. Milking, cooling, ventilation and drying line up well with solar output.
Read the guideSolar for businesses
Shops, offices, workshops and factories that trade in daylight can use most of what a roof system makes.
Read the guideThe same national rules apply in Sligo
SEAI grants, ESB Networks notification and export payments work the same way in every county. A grant has to be approved before any work starts.
Grant values are set by SEAI and can change. Check seai.ie before you sign anything.
SEAI domestic Solar PV grant for homes.
SEAI grant for a home battery of 5 kWh or more.
SEAI Non-Domestic Microgen Grant for new applications 6 Oct 2026 to 6 Jul 2027, up to €325,200. Source: seai.ie, read 12 Nov 2026.
SEAI heat pump grants depend on the system and the home. Check current amounts on seai.ie.
Home systems are notified to ESB Networks on the NC6 form, using the MPRN from your bill.
The Clean Export Guarantee pays for exported units. Your supplier sets the rate under a CRU framework; a smart meter is needed.
Thinking about solar in Sligo?
Get a free estimate from a registered installer near you. Start with your electricity bill; it shows how much of your use falls in daylight.
Around County Sligo
The guide applies across the county, including these towns.
Work out your own numbers
Bill check
Upload your electricity bill to start a free estimate request. The bill shows how your use splits between day and night.
Start with your billSavings calculator
Move the sliders for house size and yearly spend to see a rough range before you talk to anyone.
Open the calculatorSEAI grant guide
The current domestic Solar PV grant rules, what qualifies and the order to do things in.
Read the grant guideSolar in Sligo: common questions
Does solar work in Sligo?
Yes. Panels run on daylight, not direct sun. At Sligo, a south facing system at a 35 degree tilt produces about 845 kWh a year for every kWp of panels (PVGIS, European Commission JRC). That ranks Sligo 31st of 32 counties, below the median county. A 4 kWp system at the same spot would make roughly 3,400 kWh a year before any shading.
What SEAI grants can homes in Sligo get?
SEAI grants are national, so the same rules apply in every county. The domestic Solar PV grant is up to €1,800 and there is a €600 grant for home batteries of 5 kWh or more. Heat pump grants depend on the system and the home. The grant must be approved before work starts.
Who tells ESB Networks about a home solar system?
Home systems are notified to ESB Networks on the NC6 form. Your installer normally completes it with your MPRN, which is printed on your electricity bill.
Will I be paid for electricity I export?
Yes, under the Clean Export Guarantee. Your electricity supplier sets the rate, within a framework from the CRU, and you need a smart meter so exports can be measured.
Do I need planning permission?
Most rooftop solar on homes falls within national planning exemptions, subject to conditions. Protected structures and some designated areas are different, so check with your local authority if your home may be affected.
Sources: PVGIS, European Commission JRC, PVcalc v5.2, fetched 2026-11-13 · SEAI grants · ESB Networks, micro-generation · CRU
Thinking about solar in Sligo?
Get a free estimate from a registered installer near you. Start with your electricity bill; it shows how much of your use falls in daylight.